B.PUBLIC Prefab FSB {Fast.Smart.Beautful) | Mountain 1400 Install January 2021
Day 1 - Panels unloaded and stacked and foundation prep.
Detail - Installation notes and diagram
Day 3 - Crane lifting top panels into place. The crew makes it look easy.
Day 3 - Great view of the walls in place.
Day 4 - Touring local builders through the site and training and onboarding for future projects.
Day 2 - Floor Panels placed.
Day 2 - Floor panels set and view of dry-stack crawl-page foundation, glue-lam, and post/beam foundation.
Day 2 - Walls Installed - showing temporary bracing until top panels are in place and attached.
Day 3 - Top panels being secured.
Day 4 - The crew taping and weather sealing exterior.
Day 5 - Install team taping interior panel seams.
A beautiful site in northern New Mexico - note NO DUMPSTER on site! More updates to come.
Detail - wall panels stacked before install - straps for picking up and placing with crane or tele-handler.
Day 3 - Wall panels going up.
Day 3 - Great shot before roof/top panels on.
Day 3 - Prep for the final panel going in.
Day 3 - Interior shot showing off the view from the bedroom ahead of the last top panel being set.
Day 5 - Tour day for clients, builders, and partners. Install crew finishing taping and stitching. Braces coming down!
Thanks to the fantastic team at Collective Building Systems for this Install! Great team and a fantastic video of their fast work on this cold-weather install in January.