“B.PUBLIC Prefab Santa Cruz Install September 2021” Day 4 - Santa Cruz partner tech tour Day 1 - Install team planning. Temp stairs and midfloor in place. Detail - Installation notes and diagram Day 3 - Site signage for visitors at a safe distance. Day 5 - Partner walk-through Day 2 - Walls up bracing on the exterior. Day 4 - Architects getting an up close look. Day 2 - That is fog - thankfully not smoke. Detail of wall panels in place before taping and structural attachments. Day 2 - Top panels being installed. Day 1 - Panels stacked and ready to roll. Day 2 - Crane assist panel by panel. Day 5 - Air sealing and structural stitching. Day 2 - Custom internal structure in place. Ten-foot standard ceiling height and 12’ option. Day 2 - standard panels ready to be lifted into place.