B.PUBLIC Prefab Santa Cruz Install September 2021
Day 4 - Santa Cruz partner tech tour

Day 4 - Santa Cruz partner tech tour

Day 1 - Install team planning.

Day 1 - Install team planning.

Temp stairs and midfloor in place.

Temp stairs and midfloor in place.

Detail - Installation notes and diagram

Day 3 - Site signage for visitors at a safe distance.

Day 3 - Site signage for visitors at a safe distance.

Day 5 - Partner walk-through

Day 5 - Partner walk-through

Day 2 - Walls up bracing on the exterior.

Day 2 - Walls up bracing on the exterior.

Day 4 - Architects getting an up close look.

Day 4 - Architects getting an up close look.

Day 2 - That is fog - thankfully not smoke.

Day 2 - That is fog - thankfully not smoke.

Detail of wall panels in place before taping and structural attachments.

Detail of wall panels in place before taping and structural attachments.

Day 2 - Top panels being installed.

Day 2 - Top panels being installed.

Day 1 - Panels stacked and ready to roll.

Day 1 - Panels stacked and ready to roll.

Day 2 - Crane assist panel by panel.

Day 2 - Crane assist panel by panel.

Day 5 - Air sealing and structural stitching.

Day 5 - Air sealing and structural stitching.

Day 2 - Custom internal structure in place. Ten-foot standard ceiling height and 12’ option.

Day 2 - Custom internal structure in place. Ten-foot standard ceiling height and 12’ option.

Day 2 - standard panels ready to be lifted into place.

Day 2 - standard panels ready to be lifted into place.

 

 
LITTLE_SECTION (LINEWORK.jpg
LITTLE RESIDENCE_PLAN.jpg