B.PUBLIC Prefab Santa Cruz Install September 2021
Day 4 - Santa Cruz partner tech tour
Day 1 - Install team planning.
Temp stairs and midfloor in place.
Detail - Installation notes and diagram
Day 3 - Site signage for visitors at a safe distance.
Day 5 - Partner walk-through
Day 2 - Walls up bracing on the exterior.
Day 4 - Architects getting an up close look.
Day 2 - That is fog - thankfully not smoke.
Detail of wall panels in place before taping and structural attachments.
Day 2 - Top panels being installed.
Day 1 - Panels stacked and ready to roll.
Day 2 - Crane assist panel by panel.
Day 5 - Air sealing and structural stitching.
Day 2 - Custom internal structure in place. Ten-foot standard ceiling height and 12’ option.
Day 2 - standard panels ready to be lifted into place.